Post Construction Cleaning
Builder's clean — ready for handover
17 November 2026
cleanmatecleaning.com
3
Areas
16
Checklist Items
✓
Bond-Backed
How to use this checklist
Tick each item as it is completed. This checklist reflects CleanMate's professional standard for post construction cleaning. Print a copy for your records or share with your property manager.
Our focus
Dust, debris and residue removed in stages, finishing with a detailed clean ready for handover or move-in.
Stage 1 — Rough Clean
4 itemsStage 2 — Detail Clean
7 itemsStage 3 — Final Clean
5 itemsNot included (available on request where noted)
- ✕Skip bins and removal of bulk building waste
- ✕Floor sealing, polishing machines or restoration (quoted)
- ✕External high-level windows without safe access
Important Notes
- •Priced per square metre — confirmed after a site inspection.
- •Tile and grout haze removal may need specialist products — included in the quote.
- •Power, water and lighting need to be on.
Cleaner Signature
Name & Date
Client / PM Signature
Name & Date
CleanMate Cleaning Services
Perth, Western Australia
This checklist is the property of CleanMate Cleaning Services. All services are backed by our 100% satisfaction guarantee. If you are not fully satisfied, contact us within 48 hours and we will arrange a re-clean within 72 hours at no extra charge.
Ready to book a post construction cleaning?
Get instant online pricing and schedule in under 2 minutes.
